Temporary site shutdown December

100.000 kWh saved

Due to the temporary site shutdown in December at our HQ, we were able to save around 100,000 kWh (compared to the same month of the previous year). The ventilation systems, the heating system, the compressor station, the test centers and our production machines contributed significantly to the savings. All facilities were shut down to a minimum.

(December 2022)